Tubular Lifting Sockets

PRODUCT PARAMETERS

  • Material: 45# carbon steel (standard); 304/316 stainless on request
  • Thread: M12–M52 metric coarse, 6H
  • Length: 50–150 mm
  • Finish: Zinc plated 8–12 µm; hot-dip galvanized 45–85 µm
  • SWL class: 1.3–32 t (C30/40 concrete, safety factor 2.5)
  • Application: Precast wall panels, columns, beams, stairs, tunnel segments
  • Standard: GB/T 699, ISO 1461
  • Service: OEM/ODM, custom lengths and threads
pcs
Description
Request a quote
FAQ

Description

Tubular lifting sockets are cast into precast concrete elements to provide a reusable threaded pick-up point for lifting, turning and transport. The socket is fixed to the formwork before pouring; after demoulding, a lifting eye, swivel hoist ring or clutch adaptor is threaded into the internal thread.

Product Parameters

Model Thread (M) Socket OD D (mm) Length L (mm) Min. embedment He (mm) SWL class* (t) Weight (kg)
TLS-M12 M12 30 50 40 1.3 0.14
TLS-M16 M16 36 60 45 2.5 0.24
TLS-M20 M20 42 70 50 4.0 0.38
TLS-M24 M24 48 80 55 6.3 0.56
TLS-M30 M30 58 95 65 10.0 1.00
TLS-M36 M36 68 110 75 16.0 1.60
TLS-M42 M42 78 125 85 20.0 2.30
TLS-M52 M52 92 150 100 32.0 4.00

* Nominal SWL for C30/40 concrete with a safety factor of 2.5. Final capacity depends on concrete strength, embedment depth, edge distance, load angle and reinforcement. Select against the factory load chart and the project lifting plan.

Key Features

  • Full M12–M52 range for wall panels, columns, beams, stairs and balconies.
  • Reusable pick-up point: accepts lifting eyes, swivel hoist rings and clutch adaptors.
  • Rolled thread, 6H tolerance, checked with go/no-go gauges before dispatch.
  • Zinc plating for indoor elements; hot-dip galvanizing for exposed or coastal projects.
  • Flat collar and optional nail holes keep the socket square to the formwork.
  • Heat number and batch code marked for traceability.

Applications

  • Precast wall panels, shear walls and façade elements
  • Columns, beams, stairs and balcony slabs
  • Tunnel segments and immersed-tube elements
  • Wind-turbine tower segments (with project-specific load verification)

Installation & Quality Control

  1. Fix the socket to the formwork; seal the thread with a plastic cap.
  2. Tie the anchor bar to the reinforcement; keep the specified embedment and cover.
  3. Check verticality before pouring; deviation ≤ 2°.
  4. Remove the cap after demoulding and clean the thread with a nylon brush.
  5. Proof-load a sample per batch and record the result.

FAQ

Q: What is the difference between a tubular lifting socket and a lifting eye anchor?
A: A tubular socket is a female threaded insert cast into the concrete; the lifting eye is screwed in after demoulding and can be reused. A lifting eye anchor is a male forged anchor that stays in the element.

Q: Can the socket be used for permanent fixing?
A: Yes, but the load direction and safety factor differ. For permanent fixing, verify pull-out capacity with the project engineer.

Q: Do you supply matching lifting eyes?
A: Yes, swivel eye bolts, lifting eyes and clutch adaptors are available in matching thread sizes.

REQUEST A QUOTE

Contact Info